Abstract—Selection of a contractor is a key decision made by
clients and the process of selection a contractor has become an
important issue in construction projects. The opportunistic
behavior of contractors in low-bids models has been detected
from many researchers in various countries and many studies
of low bids have found that for the best economic results and
good quality, the lowest bid is not considered sufficient to
ensure the desired results. A contractor selection problem is a
multi-criteria problem. This paper aims to propose integrated
model for determining criteria prequalification to select a
contractor. The proposed integrated model contains three
components. First, Non-parametric tests will use to deal with
categorical variables for ranking alternatives. Second, ANN
model will apply to determine the relationship between decision
factors by using backpropagation multi-layer perceptron
(MLP). Third, AHP model will assign the relative importance
weightings of several evaluation factors by using Web-HIPRE
software to rank the criteria. We hope that the result from
proposed model will be encouraging.
Index Terms—Multi-criteria decision-making, AHP,
selection criteria, web-HIPRE software, backpropagation
multi-layer perceptron, prequalification contractor,
non-parametric tests.
The authors are with the Department of School of Computing, University
Utara Malaysia, Malaysia (e-mail: waledalzobiar@hotmail.com,
ary321@uum.edu.my).
[PDF]
Cite: Waled Alzober and Abdul Razak Yaakub, "Integrated Model for Selection the Prequalification Criteria of Contractor," Lecture Notes on Software Engineering vol. 2, no. 3, pp. 233-237, 2014.